PropertyValue
rdf:type
rdfs:label
  • New Europe Bridge
owl:sameAs
prov:wasDerivedFrom
skos:prefLabel
  • New Europe Bridge
skos:altLabel
  • Danube Bridge 2
  • Vidin-Calafat bridge
  • second bridge over the Danube
clgo:bridgeCarries
  • Four lanes of roadway, one railway track and a combined bicycle path/pedestrian walkway (the designed second walkway was not completed: it runs only from the Bulgarian river bank to the island under the bridge)
clgo:builder
clgo:country
clgo:crosses
clgo:length
  • 1971.0
clgo:locatedInArea
clgo:location
clgo:mainspan
  • 180.0
clgo:openingDate
  • 2013-06-14
clgo:openingYear
  • 2013
clgo:type
clgo:vehiclesPerDay
  • 2590
clgo:width
  • 31.35
is clgo:routeStart of